Quotes, invoices and getting paid, in plain English.
Short guides for the bits of running a trade nobody taught you, checked against the rules. Each one has the words to send.
How to chase an unpaid invoice without losing the customer.
A step-by-step for UK trades, from the polite nudge to the small claims court, with the words to use at each stage.
How to follow up a quote without being pushy.
Most quotes that go quiet are never followed up. The ones that are, politely and at the right moment, are the ones that turn into jobs.
Taking a deposit before you start: how much, how to ask, and what the law says.
A deposit is the difference between a job that pays for its own materials and one that's on your card for six weeks. Here's how to ask for one without it being awkward.
What to put on a quote, so the job goes the way you priced it.
For most trade jobs the quote is the contract. Here's what has to be on it, what should be, and the lines that stop an argument before it starts, with a worked example you can copy.
Quote or estimate: what's the difference, and which should you give?
One is a promise and one is a best guess, and customers know the difference better than most trades think. Here's what each means in UK law, when to use which, and how to word an estimate so nobody reads it as a fixed price.
What to put on an invoice: the UK rules for trades, with an example.
What every invoice needs, what a limited company adds, what changes once you're VAT registered, and a finished invoice laid out line by line.
CIS on an invoice: how a subcontractor shows the deduction, with the numbers.
Who the Construction Industry Scheme covers, what's deducted and from which part of the bill, and where the VAT reverse charge comes in. With an invoice where the sums add up.
Plus VAT or including VAT: how to show VAT on a quote.
Get it wrong with a householder and you either swallow the VAT or fall foul of consumer law. Here's the rule, when 'plus VAT' is fine, and the words to put on the quote.
Payment terms for tradesmen: what to choose and what to write.
Your payment terms are the date the customer agreed to pay you. Pick them before the job, put them on the quote, and every reminder after that is just holding them to their word.
Late payment interest: what you can add to a late business invoice, and how to claim it.
When a business pays you late, the law adds interest and a fixed sum to what they owe, whether or not your terms mention it. Here's how it works, how to work it out, and when it's worth asking.
The 14-day cancellation rule: when a customer can cancel a job, and how to start early safely.
Most jobs a tradesman agrees with a homeowner come with a 14-day right to cancel. Get the paperwork right and it costs you nothing. Get it wrong and you can end up doing the work for free.
How to price a bathroom job, line by line, so the price holds.
A bathroom refit is a stack of small jobs, each with its own days and its own materials. Price each one, add what's hidden under the floor as its own line, and the total stops being a guess.
How to price a rewire, from the survey to the certificate.
A full rewire is days of labour, a van of materials and a certificate at the end. Count the circuits and points, price the days honestly for the house as it'll be on the day, and say plainly who fills the holes.
How to quote a roofing job: re-roofs, repairs and flat roofs.
A roof quote lives or dies on three things: the measurements, the scaffold and the weather. Get those right, say what happens when the old covering comes off, and the price holds.
Day rate or price per job: which to charge, and how to work out your day rate.
A day rate puts the risk of the job running long on the customer. A fixed price puts it on you, and pays you for being quick. Here's how to choose, and how to arrive at a day rate from what you actually need to earn.
Invoice numbering: the HMRC rule, formats that work, and what to do about a mistake.
Every invoice needs a number of its own. Once you're VAT registered, HMRC also wants them in sequence. Here's how to set up a numbering scheme once and never think about it again.
Stage payments on longer jobs: how to set them, invoice them and get them paid.
On a job that runs for weeks, one invoice at the end means you fund the materials and your wages until it's done. Stage payments split the price into parts the customer pays as the work goes in.
Your next quote, out tonight.
Set up takes a few minutes: your business, your prices, your terms. Then the first quote goes out with your name on it, and you know when they open it.
Start 14 days free14 days free, then £24.99 a month. A card to start, nothing charged until day 15. Cancel any time.
- 14 days free, then £24.99 a month
- A card to start, nothing charged until day 15
- Cancel any time