The short answer: a quote is fixed, an estimate is a best guess
A quote says 'this job, for this price'. When the customer accepts it, that price is part of the contract. Citizens Advice tells householders that a trader can't charge more than a quote unless the customer asked for or agreed to extra work, or the quoted price was an obvious mistake. A rise in material costs after you quoted is your risk, not theirs.
An estimate says 'I think it will be about this, and here's why it might not be'. The final bill can come in different, but not wildly, and not without a reason the customer can follow. If it comes in much higher, Citizens Advice tells them they can dispute it and propose what they think is reasonable.
What the law says when no price was fixed
For a householder, the Consumer Rights Act 2015 fills the gaps in a contract for a service. If the contract doesn't fix a price or say how it's worked out, the customer has to pay a reasonable price, and no more. What's reasonable is a question of fact: what the work was, what others would charge, and what you told them to expect.
That last part matters. The same Act treats what you said or wrote about the service as part of the contract if the customer relied on it. So an estimate isn't nothing. A written figure of £1,200 that turns into a bill of £2,000 with no explanation is hard to call reasonable, whatever the paper was headed.
For a business customer in England, Wales or Northern Ireland, the Supply of Goods and Services Act 1982 does the same job: where no charge was agreed, a reasonable charge is payable.
What applies either way: care, skill and time
Whether you quoted or estimated, the Consumer Rights Act requires the work to be done with reasonable care and skill. If it isn't, a householder can ask you to put it right at your own cost, or, if that's impossible or isn't done within a reasonable time and without significant inconvenience, to take money off the price. A term in your paperwork that tries to exclude that won't bind them.
If you don't agree a date, the work has to be done within a reasonable time. Like a reasonable price, that's a phrase people argue about, which is the best reason to write a start date on whatever you give them.
When to give a quote and when to give an estimate
Customers prefer a quote, because they know where they stand. Give one whenever you honestly can. Give an estimate when part of the job can't be seen or measured until you start.
- Quote: a boiler swap, a new consumer unit, a fence of known length, a room to decorate. You can see it all and price it all.
- Estimate: tracing a leak, a damp problem, a rewire in a house with unknown wiring, anything under a floor or behind a wall you haven't opened.
- Both: quote the part you can see, and estimate the part you can't, as separate lines. 'Fit the new bath, £850. Repairs to the floor beneath, if needed, estimated £150 to £400.'
- Neither, yet: if you can't even guess, offer a paid investigation first, priced as a fixed sum, then quote properly once you know.
How to word an estimate so it isn't read as a quote
The heading on the paper doesn't settle it on its own. A document called an estimate that gives one firm figure and no caveats can easily be read as a fixed price. Under the Consumer Rights Act, written terms for a householder have to be in plain, intelligible language, and where a term could mean two things, the meaning that favours the customer wins. So make it unmistakable.
Use the word estimate. Give a range rather than one number. Say what's uncertain and why. Say how the final price will be worked out, for example by your day rate and the materials used. And give them a point at which you'll stop and check before going further. That last line is what customers value most, because it means the bill can't run away from them.
Hi Alice, thanks for having me round. This is an estimate, not a fixed quote, because I can't see the state of the pipework under the kitchen floor until it's up. I expect the job to cost between £600 and £900 including VAT, worked out at my day rate of £280 plus materials at cost. Two to three days. If it looks like going over £900 I'll stop, show you why, and agree the rest with you before carrying on. Dean, DW Plumbing.
A day rate is an estimate too
Charging by the day or the hour is fine, but it isn't a fixed price, and customers are rightly wary of it: Citizens Advice warns them that a daily rate can let a job drag on. Make it fair and clear. Say how many days you expect, how many hours make a day, and that you'll ask before going beyond that. It costs you nothing and it removes the one worry they have about day work.
What to do when the job changes
Whether you quoted or estimated, the moment the job changes is the moment to talk, not the end. Something found behind a wall, a customer who wants an extra socket, a part that's been discontinued: each one changes the price, and each one needs agreeing before you do the work.
- Stop and show them. A photo on their phone does the job if they're out.
- Say what it is, what it'll cost, and what happens if they'd rather not.
- Get their yes in writing. A text reply is enough, and keep it.
- Put it on the invoice as its own line, so the original price and the extra are both plain.
The message to send when something changes
Keep it short and factual. The customer should be able to say yes or no from the message alone.
Hi Alice, when we lifted the old tray we found the waste pipe has been leaking into the joist underneath. I'll need to cut out and replace about a metre of it before the new tray goes in: £145.00 including VAT, and it adds half a day. Photos attached. Can you reply yes to go ahead? If you'd rather leave it, I'll make it safe and we'll talk it through. Dean.