Why the wording on a quote matters
Once the customer accepts it, your quote is the contract. For a householder, the Consumer Rights Act 2015 treats anything you said or wrote about the job as part of that contract if they relied on it when deciding to go ahead. What's on the page counts for more than what was said on the doorstep, so put it on the page.
Citizens Advice tells householders that a quote is a fixed price, and that a trader can't charge more than it unless the customer asked for or agreed to extra work, or the quoted price was an obvious mistake. Materials going up after you quoted doesn't count. So the quote has to be right, and it has to say exactly what it covers.
What has to be on a quote for a householder
Most trade jobs are agreed in the customer's home, or by text after a visit there. That makes them off-premises contracts under the Consumer Contracts Regulations 2013, and before the customer is bound you have to give them certain information, on paper or, if they agree, by email or another lasting form. In plain terms:
If you leave out the cancellation information, the 14 days can stretch to as long as a year, and a customer who cancels may owe you nothing for work already done. If they want you to start inside the 14 days, get them to ask for that in writing.
- Who you are: your trading name, a postal address, and a phone number or email.
- What you'll do: the main things the job involves.
- The total price including taxes, or, if it genuinely can't be worked out in advance, how it will be worked out.
- Any other costs on top, or the fact that there may be some.
- How payment works and when you'll do the work.
- Their right to cancel within 14 days, how to do it, and a cancellation form.
Say exactly what's included, and what isn't
The scope is the heart of the quote. Write it as a short list of what you'll actually do, in the order you'll do it, in words the customer uses. Then write what isn't included. Most disputes about a bill are really disputes about scope: the customer thought tiling was in, you thought it was theirs.
- The work, line by line: 'Remove the existing shower and tray', not 'Bathroom works'.
- Materials: what you're supplying, the make or standard where it matters, and what the customer is supplying.
- Exclusions: decorating, tiling, electrics, making good beyond the area you disturb, anything hidden you can't see until it's opened up.
- Access and conditions: parking, water off for a day, a room cleared before you start.
The price, and the VAT position in plain words
Give one total. A breakdown of labour and materials helps the customer compare, but the figure they're agreeing to should be obvious. If you charge by the day for part of it, say how many days and how many hours make a day, because an open-ended day rate is an estimate, not a fixed price.
For a householder, the price you show must be the total including VAT if you charge it. If you're not VAT registered, say 'No VAT is charged' so nobody wonders. For a business customer you can quote a net price, but write '+ VAT' beside it. Most building and repair work is standard rated at 20%, but some isn't: installing certain energy-saving materials in a home, such as insulation or heat pumps, is zero rated until 31 March 2027. At the time of writing, the VAT registration threshold stood at £90,000 of taxable turnover. Rates and thresholds change, so check gov.uk, or with your accountant if a job is borderline.
How long the price stands
There's no legal rule on how long a quote is valid, but if you don't say, a customer can come back months later expecting the same figure. Thirty days is common for labour; where a material price moves fast, say so and keep it shorter. Put it in one plain sentence near the price.
Deposit, payment terms and the start date
Write the deposit as a line and a sentence: how much, when it's due, what it secures. Then say when the balance is due and how they can pay. Agreeing it on the doorstep and never writing it down is how it turns into 'I didn't know I had to pay anything up front'.
Give a start date or a week, and roughly how long the job will take. If the contract doesn't fix a time, the Consumer Rights Act says the work has to be done within a reasonable time, which is exactly the kind of phrase people argue about. A date is better for both of you.
Extras and changes: agreed before you do them
Jobs change. A floorboard comes up and there's rot underneath; the customer decides they want the other basin moved as well. The quote should say how that's handled, so the conversation is about the work and not about whether you're allowed to charge for it. The rule that keeps you on the right side of the law is simple: tell them, price it, and get a yes in writing before you do it.
Waste, making good and your guarantee
Say who clears the waste and whether a skip is included. The government's waste duty of care code is clear that waste produced by a tradesperson's work belongs to the tradesperson, who is responsible for getting rid of it properly and should include the cost in the price. If you take waste away in your van you need to be registered as a waste carrier, and householders are told to check. Putting your registration number on the quote answers the question before it's asked.
If you guarantee your work, say for how long and what it covers. A guarantee adds to the customer's legal rights, it can't take them away: the Consumer Rights Act requires work to be done with reasonable care and skill, and a term that tries to exclude that won't bind a householder.
A worked example quote
Here's a complete quote for a small bathroom job, laid out the way a customer reads it. Change the details, keep the shape.
DW Plumbing, 14 Station Road, Leeds LS6 2AB. 07700 900123. dean@dwplumbing.example. VAT no. 123 4567 89. Waste carrier no. CBDU000000. Quote Q-231 for Alice Hughes, 22 Elm Grove, Leeds. Date: 11 November 2026. The work: remove the existing shower, tray and screen. Fit a new 900mm tray, thermostatic mixer shower and glass screen. Replace the two basin taps. Seal, test and leave working. Materials supplied by us: tray, mixer shower, screen, two basin taps, fittings. Shower and taps as chosen on the visit. Not included: tiling, decorating, electrical work, or repairs to anything found behind the existing tray. If we find a problem we'll stop, show you, and price it before doing anything. Price: £630.00 plus VAT £126.00. Total £756.00 including VAT. Deposit: £189.00 (25%) to book the date and order the materials. Balance on completion, within 7 days of the invoice, by bank transfer. Start: week of 30 November. About two days on site; water off for half a day. Waste: we take all old fittings and packaging away. No skip needed. Extras: any change you ask for, or work we find is needed, will be priced and agreed with you in writing before we do it. Guarantee: our workmanship for 12 months, on top of your legal rights. Parts carry the maker's guarantee. This price stands for 30 days. You have the right to cancel within 14 days of accepting; the cancellation form is attached. If you'd like us to start sooner, tell us in writing.
Lines that prevent the argument later
A few sentences do most of the work. Each one answers a question that otherwise gets asked at the end, when the invoice arrives.
- 'If we find a problem we'll stop, show you, and price it before doing anything.'
- 'Any change you ask for will be priced and agreed in writing before we do it.'
- 'This price stands for 30 days.'
- 'Not included:' followed by the things people assume are.
- 'We take all waste away' or 'Waste is left in the skip you've hired', whichever is true.