How to price a bathroom refit: the method
Every bathroom is different, so there's no honest single figure for what one costs. What you can get right every time is the method. Break the job into stages, put days against each stage, cost the materials separately, and add the lines people forget. Then the price is something you can explain line by line if the customer asks why.
The build-up most trades use looks like this. Work through it in the same order every time and you won't leave a line out.
- Labour: days for each stage, times your day rate.
- Materials: what you're buying, at cost, plus a markup you've decided on and stick to.
- Waste allowance on tiles and boards, because nothing comes in the exact quantity you need.
- Other trades: an electrician, a plasterer, at the price they've given you.
- Waste removal: skip, tip runs or a waste collection.
- A provisional line for what you can't see until it's opened up.
- VAT on top, if you're registered.
What to check on the survey
Most bathroom prices that go wrong went wrong on the visit. Measure properly and look at the things that will cost you time later. Take photographs; you'll want them when you're building the price at the kitchen table.
- Wall and floor areas to be tiled, measured wall by wall, with the window and door taken off.
- The floor: boards or concrete, any bounce, any sign of past leaks round the toilet or bath.
- Where the waste runs and whether the new layout keeps it. Moving a toilet is a different job from replacing one.
- Water pressure and the hot water system, because a new shower has to work with what's there.
- Existing extract fan and lighting, and the condition of the wiring you can see.
- Access: stairs, parking, where the old suite goes on its way out, and whether the house will have a working toilet while you're there.
- Textured ceilings or old floor tiles. The HSE says asbestos may be in any home built or refurbished before 2000, so if you suspect it, it gets checked before you disturb it.
Strip-out and waste: price it and say who takes it away
Strip-out takes longer than people expect: the suite, the tiles, often the boards behind them, and the clearing up. Give it its own days rather than tucking it into the fitting.
The waste is yours. The government's waste duty of care code says a tradesperson is responsible for the waste their work produces, including taking it away and disposing of it, and that the cost should be in what they charge. In England you register as a waste carrier with the Environment Agency, and in Wales with Natural Resources Wales. Old baths, sinks and toilets count as construction and demolition waste, which Natural Resources Wales lists as needing upper tier registration even when you produced it yourself. Check which tier you need on gov.uk, and put your registration number on the quote.
First fix, second fix and tiling: pricing the labour
Price labour in days per stage, not one lump. First fix is the pipework, wastes and any boarding before the walls are closed. Tiling is usually the longest stage and the easiest to underestimate, so price it from the area you measured, at the pace you actually work, with extra time for cuts round a window or a boxed-in pipe. Second fix is the suite going in, connecting up, sealing and testing.
Work out the tile quantity from the measured area plus a waste allowance, then round up to whole boxes. Ten per cent is a common allowance for straight lay; large format or a pattern needs more. Say on the quote that the allowance is included, because a customer buying tiles themselves will otherwise buy the bare area and run short.
Who supplies the bath, basin and toilet, and why the quote must say
Customers often want to choose and buy the suite and tiles themselves. That's fine, but it changes your price and your responsibility, so the quote has to say which items they're supplying.
When you supply an item, the customer's rights over it being faulty or not as described usually run to you, because you supplied it. When they buy it themselves, those rights are with the shop that sold it, and your responsibility is fitting it with reasonable care and skill, which the Consumer Rights Act 2015 requires of any service. Make it a condition that customer-supplied items are on site, complete and undamaged before the start date, and say what happens if they aren't: a wasted day is a day you charge for, if the quote said so.
Electrics in a bathroom: zones and Part P
In England, the Building Regulations make some electrical work notifiable: any new circuit, replacing a consumer unit, and any addition or alteration to existing circuits in a special location. In a room with a bath or shower, the special location is the space within 0.6 metres of the edge of the bath or tray, up to 2.25 metres from the floor. Swapping a light fitting like for like elsewhere in the room is usually not notifiable; a new circuit for an electric shower is.
Notifiable work is done by an electrician registered with a competent person scheme, who self-certifies it, or is notified to building control before it starts. In Wales, work in kitchens and bathrooms and outdoors is notifiable more widely, so check the Welsh guidance. Scotland and Northern Ireland have their own building standards.
If you're bringing in an electrician, get their price before you quote and put it in as its own line. The Planning Portal also says that when you refurbish a bathroom, any existing extract ventilation has to be kept or replaced, so if the fan is coming out, its replacement is in the price.
Contingency for what's under the floor
You can't see rotten boards, a joist cut too deep or a leaking waste until the bath's out. Don't pad the whole price to cover it, and don't promise it won't happen. Put a provisional line on the quote with a rate: a price per board or per hour, charged only if the work is needed, after you've shown the customer.
That keeps the main price honest and fixed, and it means the conversation about the floor is about the floor, not about whether you're allowed to charge for it.
A worked example price build-up
Here's a build-up for a straightforward refit: strip out, new suite in the same layout, tiled walls and floor. The rates are made up for the example. Use your own day rate, your own supplier prices and your own markup.
Example only, with made-up rates. Labour at £220.00 a day: strip-out 1 day, first fix 1.5 days, boarding and preparation 1 day, tiling 3 days, second fix 1 day. 7.5 days = £1,650.00. Tiles: 12 square metres measured, plus 10% waste = 13.2, rounded up to 14 square metres in whole boxes at £25.00 = £350.00. Boards, adhesive, grout and trims: £220.00. Pipework and fittings: £130.00. Materials at cost: £700.00. Markup at 15%: £105.00. Materials total: £805.00. Electrician, fixed price including testing and certification: £380.00. Waste removal: £240.00. Price: £1,650.00 + £805.00 + £380.00 + £240.00 = £3,075.00. VAT at 20%: £615.00. Total including VAT: £3,690.00. Provisional, only if needed: replacing floorboards or repairing joists at £250.00 plus VAT, priced and shown to you before it's done. Bath, basin, toilet and taps supplied by the customer; fitting included.
How to present a bathroom price on the quote
The customer doesn't need your day rate or your markup. They need the work in the order you'll do it, one total, what they're supplying, what isn't included and what happens if something's found. For a householder, show the total including VAT if you charge it.
Bathroom refit at 22 Elm Grove. The work: remove the existing suite and wall tiles and take all waste away. Replace the pipework to the new positions. Board and tile the walls and floor. Fit and connect the bath, basin, toilet and taps you've chosen. New extract fan and shower circuit by our registered electrician, with the certificate. Seal, test and leave working. You're supplying: bath, basin, toilet and taps, on site and complete before the start date. We're supplying: tiles as chosen, boards, adhesive, grout, pipework and fittings. Not included: decorating, or work outside the bathroom. Price: £3,075.00 plus VAT £615.00. Total £3,690.00 including VAT. If we find damaged boards or joists under the bath, we'll stop, show you, and price the repair before doing it.